Environmental information disclosure
ONE、Basic information
1. Unit name:HL CORP (Shenzhen)
2. Organization code:914403006188220739
3. Legal representative:JIM
4. Production address:THE 3RD INDUSTRIAL PARK, BITOU VILLAGE, SONG GANG TOWN, BAOAN DISTRICT SHENZHEN 518105 P.R.CHINA
5. Contact information:0755-27130185
6. The main contents, products and scale of the production and management and management services: the production of bicycle spare parts (the front forks, the handlebars, the risers and the cushions), the annual output is 6 million 240 thousand, 43 million 330 thousand, 34 million 250 thousand, and 6 million 220 thousand.
TWO、Pollutant discharge information
1. Name of pollutant:PH value, suspended matter, chemical oxygen demand, total chromium, six valence chromium, total nickel, total copper, total zinc and total phosphorus.
2. Emission mode:
3. Quantity and distribution of discharge outlets: 1, numbering: WS-6377521, located in the company's sewage treatment station.
4. Pollutant discharge concentration and total amount:
project |
PH value |
Suspended matter |
Chemical oxygen demand |
Total chromium |
Six valent chromium |
Total nickel |
Total copper |
Total zinc |
total phosphorus |
Limit of emission concentration |
6~9 |
30 |
80 |
0.5 |
0.1 |
0.5 |
0.5 |
1.0 |
1.0 |
Daily emission limit |
350Ton / day |
Annual emission limit |
11.55Ten thousand tons |
||||||
Annual emission limit (Dun /nian) |
/ |
3.46500 |
9.24000 |
0.05775 |
0.01155 |
0.05775 |
0.05775 |
0.11550 |
0.11550 |
5. Exceeding the standard:NOT
THREE、Construction and operation of prevention and control of pollution facilities:
The sewage treatment station of the company was built in December 2000. In 6 period of 2001, the Shenzhen Municipal Environmental Protection Bureau passed the inspection and acceptance, and then after 2 transformation and optimization, the wastewater treatment facilities were increased steadily, and the wastewater treatment facilities were stable. In the last 5 years, no exceeding the standard discharge situation occurred, and the sewage treatment facilities had been built in the past 5 years. Line monitoring room control, pH value, COD, total Ni, Cr, TP, flow monitoring and real-time upload.
FOUR、Report on the environmental impact report of the construction project and the review of the environmental impact assessment(Annex one)
FIRE、Emergency plan for emergency environmental events(Annex two)